MEP Member: New Hampshire Manufacturing Extension Partnership
Client: Baron Machine Co Inc (District 01)
- Increased floor space by 30 percent.
- Removed 44 tons of unusable material.
- Reduced travel distance from 1,394 linear feet to 168 linear feet.
MEP Member: New Hampshire Manufacturing Extension Partnership
Client: CA Design (District 01)
- Realized $38,000 in savings.
- Reduced changeover time by 30 percent.
- Estimated reduction in set-up generated scrap by 95 percent.